Superior Performance Design · Geothermal · Well Integrity

Geothermal WIMS Review & Implementation — 57-Well Portfolio

57-well asset portfolio · Asia Pacific · End-to-end audit, system, training

57 Geothermal Wells100% Compliance Verified3 Service Phases Delivered

Project Overview

A geothermal energy operator with a 57-well asset portfolio approached SPD to design and implement a fit-for-purpose Well Integrity Management System (WIMS). The operator’s existing processes lacked the structure, data visibility and reporting capability needed to manage integrity proactively — creating both compliance exposure and unnecessary maintenance cost.

SPD’s Approach

SPD conducted a structured audit and gap analysis of existing well integrity arrangements, mapping current-state processes against industry standards and regulatory requirements. From this baseline, SPD designed and configured a tailored WIMS that centralised all well data into a single, accessible platform. SPD also delivered hands-on in-house training for the client’s well services team.

Results & Value Delivered

✔ Centralised Visibility — All 57 wells tracked in a single platform with live integrity status and alert-driven remedial workflows.

✔ Regulatory Compliance — WIMS verified to meet both operator internal standards and applicable legal requirements.

✔ Capability Transfer — In-house training embedded well integrity competence within the client’s own team.